WHAT IS THE GEIG?
With the EPBD amendment adopted by the EU in May 2024, the requirements for providing charging infrastructure will become even stricter. However, the EU specifications must still be transposed into national law (GEIG).
ARE YOU AFFECTED?
With the EPBD amendment adopted by the EU in May 2024, the requirements for providing charging infrastructure will become even stricter. However, the EU specifications must still be transposed into national law (GEIG).
GEIG REQUIREMENTS FOR NON-RESIDENTIAL BUILDINGS
| Topic | Current | Planned |
|---|---|---|
New build / renovation of non-residential buildings |
From > 6 parking spaces |
From > 5 parking spaces |
Ducting infrastructure new build / renovation |
Every 3rd parking space |
100% of parking spaces prepared |
Charging points |
1 charging point |
1 charging point per 5 parking spaces (Office: 1 per 2 parking spaces) |
Existing building > 20 parking spaces |
1 charging point |
1 charging point per 10 parking spaces or |
- Pre-cabling:
- All measures necessary to enable the installation of charging points, including data transmission, cables, cable routes, and, if applicable, electricity meters
- Ducting infrastructure:
- Namely protective conduits for electric cables
- Renovation:
- The renovation of a building where [...] more than 25 percent of the surface of the building envelope undergoes renovation
We make you GEIG Ready
With our Charging as a Service model, you as the owner save on the investment in wallboxes.
Our 360° approach:
1. ANALYSIS
Review of legal requirements and technical prerequisites.
2. CONCEPT
Individual planning of the charging infrastructure.
3. IMPLEMENTATION
Installation and commissioning.
4. OPERATION
Service, maintenance, and user management.
GEIG & EPBD Quick Check
Ermitteln Sie in weniger als einer Minute die gesetzlichen Anforderungen für Ihre Immobilie.
FAQ
What is the GEIG?
The Building Electric Mobility Infrastructure Act (GEIG) regulates the preparation and installation of charging infrastructure in buildings.
Which commercial properties are affected?
Primarily office and non-residential buildings with larger parking areas.
When does the obligation apply?
The requirements apply depending on the building type, whether it is a new build or an existing building, and the number of parking spaces.
Do wallboxes need to be installed immediately?
Not always. Often, preparing the infrastructure is sufficient at first.
How many charging points are required?
This depends on the type of building and the number of parking spaces.
Can existing infrastructure be expanded?
Yes, modern systems are modular and scalable.
How does load management work?
The available power is intelligently distributed across multiple charging points.
Can employees and guests be billed separately?
Yes, user groups and billing can be managed individually.
Are there funding opportunities?
Depending on the region and project, funding programs may be available.
How long does implementation take?
Depending on the size and existing conditions, it usually takes a few weeks to months.
What advantages does charging infrastructure offer companies?
-Attractiveness as an employer; -Future-proof property; -Support for ESG goals; -Preparation for electric mobility
Can PV systems be integrated?
Yes, charging infrastructure can be combined with photovoltaics and energy management.